Weeks 11 – 12 Mud & Mortar

12 01 2012

I called this Mud & Mortar week, because there was a lot of both being slapped up.  On the interior, drywall mud went up throughout the addition and in parts of our existing house.   Meanwhile the first layer of stucco, called a “scratch” coat, was applied on the exterior.

DRYWALL MUD – There’s a ton of it everywhere.  In the left photo the area above the window is all mud to level out those cut-out areas with the earthquake straps.  In the right photo is looking down the hallway.  Didn’t realize they use so much of the stuff.  And it all has to be sanded smooth. They wet sanded, but there’s still a lot of residue and dust.  Respirators and masks are a must around this stuff.  Best just to avoid the area altogether if you can.

 

  < THE BATHROOM VANITY goes on this wall.

Below the tub got a good dose of mud in and around it that I wiped off before it hardened.  And next to it the doors in the laundry room are covered in plastic.

 

  < SHOWER STALL IS WATERPROOFED

STUCCO – The first “scratch” coat is applied.  It’s cement on your house, the norm in California.

 

At the last minute we decided to cover up the old brick chimney.

 

We also decided to restucco the whole house, so that will add a few extra days to the project timeline. Oh well, at least the new and old will be seamless, which you’ll see in a few weeks.   After this we took a week off to be with family over the holidays.  There was no snow, for which some of us were very thankful, while others were very disappointed.  One final task of 2011 was to buy and install locking door knobs, which really made us realize it won’t be long before we get to live in this new part of our house on greenwood.  Thanks for following along!