Weeks 6-7 – Thankful for Windows!

22 11 2011

Combined the weeks due to the short holiday week and no work is scheduled Wed. – Fri.  Another crazy busy week.  Ordered vanity and countertop. Windows and shingles installed. Plumbing rough in too.  Another inspection.

 

  Windows are Marvin Integrity All Ultrex, a strong, durable composite.

 

  Tile border selection – chose the middle one: Tozen Mini Brick in Selenium by Lunada Bay.

  1st Oops … Nails came through tile niche in our existing bathroom.  Temporarily patched holes with silicone.  Luckily we saved a leftover box of these tiles, so it should be easy to repair.

 2nd Oops … roofing crew mistakenly installed 2 attic vents in our vaulted ceiling. They’ll have to return to fix.

More photos to browse through.

Advertisements

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: